Upper Dordi’A’ Hydroelectric Project|25 MW
The Upper Dordi ‘A’ Hydroelectric Project, located in Lamjung district of Gandaki Zone, is a run-of-river type project. The project has been designed to generate 25.0 MW power using water from Dordi Khola
The annual energy generation capacity of the project is 138.40 GWh (Dry energy – 22.85 GWh & Wet Energy – 115.55 GWh) . The power generated from this project is connected to proposed Kritipur Besi Hub near power house of Project. The length of transmission line is about 0.5 km.
The design discharge for the project is taken as 9.8m3/s.
Salient Features:
Design Discharge :9.8 m3/s
Gross Head: 299.31 m
Installed Capacity:25 MW