Upper Phawa Khola Hydropower Project |5.8MW

  • Home
  • Upper Phawa Khola Hydropower Project |5.8MW

Upper Phawa Khola Hydropower Project |5.8MW

Client Name: Unitech hydropower Company Pvt. Ltd
Completed Date: March 2024

 

Phawa Khola Hydropower Stations a run-of-river hydro-electric plant located in Taplejung District of Nepal. The flow from Phawa River is used to generate 5 MW electricity.

Silent Features:

Installed Capacity:5MW